Case Studies

IMG_4856.jpg
 
 
 

Boiler Replacement


 
 

This Condo Association was coming out of a bad experience with a boiler service company and was looking a responsible partner who would look out for their best interest.

20170918_124846.jpg
 

 

Chiller Replacement


 
 

Having had persistent issues with a 129 ton chiller, this hotel in Anaheim knew they needed to get the replacement done. The building had existing piping and electrical issues that needed to be resolved at the same time.

 
HVACchiller.jpg
 

 

Ductless Mini-split Installation


 
 

This affordable housing project received a grant to install ductless mini-splits in historical cottages in Escondido. There were several surprises as the project unfolded.

Alpic+9%2C000+BTU+Ductless+Mini+Split+Air+Conditioner+with+Heater+and+Remote.jpg
 

 

Mechanical Plumbing


 
 

The client was referred to us by a sister property that was happy with the service. Their dual boiler system was in need of a re-pipe between the two boilers and given that one boiler had a leaking heat exchanger, time was of the absolute essence.

 
20190311_111332.jpg
 

 

Roof Top Package Units


 
 

Summer was upon us and the residents in the retirement community had been on lock down for weeks now. Replacing the seven five-ton units that serviced the common areas was critical and the project needed close collaboration between all construction partners.

 
15 year old units that had reached the end of their usable lifespan

15 year old units that had reached the end of their usable lifespan

 